NASA Metal Earth Apollo CSM with LM Model Kit
PRE-ORDER
PRE-ORDER NOTES
- Product is not in stock and will ship upon arrival
- Arrival date is an estimate and not guaranteed
- No payment is due until product is available to ship
- Customer may cancel anytime prior to payment
STANDARD GRADE
- This item is brand new and in mint condition
- Packaging is case fresh but may have flaws
- Suitable to display in package or to open
- Listed Price EXCLUDES Tariff Surcharge
Product Description
The Apollo 11 moon landing required two spacecraft- The lunar module (LM) and command service module (CSM). Once in lunar orbit, the two would separate so the LM could land while the CSM waited in orbit. After launching from the lunar surface, the LM’s ascent stage would rendezvous and dock with the waiting CSM, then the astronauts would transfer back into the main spacecraft and head home. It sounds nearly impossible but that’s the way it was July 20, 1969.
This model includes a golden plaque to commemorate the 50th anniversary of Apollo 11.
Metal Earth is made from high-quality steel sheets. Each model features amazing detail with parts cut from one or more 4” square steel sheets. Easy-to-follow instructions are included with each kit and NO GLUE OR SOLDER REQUIRED! Simply snip out the pieces and bend the tabs through corresponding connection points.
Product Features
- Assembled: 5.07 inches tall (12.88cm)
- Made of steel metal
- Based on the NASA spacecraft
- Part of the Metal Earth series
- Difficulty level: Challenging
- No glue or soldering required
Box Contents
- 4 Sheets to build Apollo CSM with LM
- Golden plaque
- Instructions
Additional Details
Due to rapidly changing tariff rates, we currently cannot determine the final tariff surcharge for this item. The price listed above is the normal BBTS price – excluding any tariffs. When we know the final tariff rate for this product, we will update you before we process your payment method for this item, and you will be able to cancel your pre-order at that time. Our customer service team, as always, will be ready to help with any issues that arise from this situation, and we will be very flexible given the circumstances.